Tools
| S.No. | Name of Equipments | Units |
|---|---|---|
| 1 | Batching Plants | 5 |
| 2 | Concrete Pump | 5 |
| 3 | Concrete Mixture | 15 |
| 4 | Concrete Weight Batcher | 10 |
| 5 | Concrete Vibrator (Needle) | 45 |
| 6 | Concrete Vibrator (Plate) | 15 |
| 7 | Material Lift with trolley | 15 |
| 8 | Tower Crane | 2 |
| 9 | Earth Compactor Elec. | 5 |
| 10 | Steel Shuttering | 1 lakh sq. ft. |
| 11 | Plywood Shuttering | As per Req. |
| 12 | Passenger and Material Lift | 3 |
| 13 | Tractor Trolley | 5 |
| 14 | Pickup Loading Vehicle | 2 |
| 15 | Welding Equipment | 2 |
| 16 | Earth Excevator (JCB) | 1 |
| 17 | Hammer Drill Machine | 20 |
| 18 | Monkey Lift | 15 |
| 19 | Bull / Tractor | 2 |